2. The inner duct is exposed by pushing the outer jacket and the insulation layer. For uninsulated ducts, there is not such a process. The inner duct is pushed over the connection piece minimum 25 mm. The connection piece is sealed with aluminium tape at least two windings around the duct. Then the clamp is attached tightly.